It has been a busy summer here at Rubenstein Renovation HQ. With the help of the entire Rubenstein staff, we have prepared over 50,000 rare books for the move! These are books that have been reviewed and loaded into acid-free cardboard trays for safe transport to and storage at the Library Service Center.

We have made progress on the archival and manuscript collections front as well, and these collections are now almost 100% ready to move to our swing space and the LSC. Below, please find some highlights of some of the work being done:

  • Oversize Materials: 670 linear feet of oversize materials and flat files have been reviewed and re-packaged for long term storage.

    Archivists Meghan Lyon and Mary Samouelian prepare oversize folders for the move.
  • Ledger-mania: Our Conservation Lab has been working wonders on our extensive collection of ledgers. The bulk of this work has been completed. Our ledgers have never looked better! Read more about the ledgers project on the preservation department’s blog Preservation Underground.
  • Extra Extra!The Rubenstein Newspaper collection is getting enhanced catalog records, better housing and some much needed TLC in preparation for its journey and new life over at the LSC. This has been a multi-team undertaking led by the Rubenstein Print Materials Coordinator, her holdings management team, our colleagues at Perkins Technical Services, and of course the Perkins conservation team.

    Newspapers in new boxes, ready fto ship to the LSC
    Newspapers in new boxes, ready to ship to the LSC
  • Manuscript Box Stabilization: Many of our manuscript collections are housed in flat boxes. To keep things from needlessly shifting during transport we have padded boxes with what will forever be affectionately referred to as “burritos.” These are pieces of folder stock rolled into tubes and wrapped in tissue paper so they stay rolled. Here are the burritos in action.

    Flat manuscript box, padded and ready to move.
  • A new Rubenstein Renovation website is in the works! Stay tuned for an announcement about this site, it will be a one-stop shop for all your renovation news needs.

What’s Next?

We are beginning the home stretch of our move preparation efforts. Materials are starting to be shipped over to the Library Service Center in small but consistent batches now that the Center’s 3rd module is nearly online.

The bulk of our materials will be moving in January and early February 2013. This will be a very busy time at the Rubenstein, so if you are planning on visiting us during this time, please contact us so we can plan ahead for your visit. Don’t forget that the reading room will actually be closed December 17, 2012 – January 6, 2013 so we can move the reading room and our offices over to our temporary location on the 3rd floor of Perkins library. We look forward to welcoming you to swing space on January 7, 2013!

Post contributed by Molly Bragg, Collections Move Coordinator in the Rubenstein Technical Services Dept.

One thought on “Renovation Round-Up”

  1. Love to see that the burritos are working! We had a fun “campfire” meeting in the lab to brainstorm that idea. Hopefully the implementation will work as effectively as the roll out. (rim shot)

Comments are closed.